so I accomplished two signifcant sections today. First was connecting the lower form to the upper railing and second was hoisting the first span into place.
that is all for now.
Subscribe to:
Post Comments (Atom)
this is a brilliant blog, of my brilliant life.
1 comment:
WOW!!
Post a Comment